You are here: Home » Product » Steel Formwork » Cantilever Climbing Formwork » Cantilever Climbing Formwork

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Cantilever Climbing Formwork

The cantilever climbing formwork, CB-180 and CB-240, are mainly used for large-area concrete pouring, such as for dams, piers, anchors, retaining walls, tunnels and basements. The lateral pressure of concrete is borne by anchors and wall-through tie rods, so that no other reinforcement is needed for the formwork.
Availability:
Quantity:


Cantilever Climbing Formwork


Introduction

The cantilever climbing formwork, CB-180 and CB-240, are mainly used for large-area concrete pouring, such as for dams, piers, anchors, retaining walls, tunnels and basements. The lateral pressure of concrete is borne by anchors and wall-through tie rods, so that no other reinforcement is needed for the formwork. It is featured by its simple and quick operation, wide range adjustment for one-off casting height, smooth concrete surface, economy and durability.


The cantilever formwork CB-240 has two types of lifting units: diagonal brace type and truss type. Compared with each other, the latter is better for the construction of heavier load, higher height and less declining angle.


The main difference between CB-180 and CB-240 is the main brackets. The width of main platform of these two systems is 180 cm and 240 cm respectively.


Characteristics

Bracket, formwork and construction load are all borne by embedded anchors and wall-through tie rods. No additional scaffolding is needed. It is suitable for construction in the high air.

The maximum height of concreting can reach 6 meters,and the whole part of formwork can be moved back 600 mm.

The formwork part can be adjusted up and down, and from left to right, relatively to the supporting bracket, and the diagonal brace type formwork can be tilted back and forth.

Each connecting parts has a high degree of standardization and versatility.

The formwork can be adjusted to stick tightly to concrete surface so as to avoid leaking or misaligning.

The bracket system is provided with a suspended platform to facilitate removal of the anchoring parts and the appearance treatment of the concrete.

Previous: 
Next: 

News

Inquiry

Related Products

Yancheng Lianggong Formwork Co., Ltd, founded in 2010, is a pioneer manufacturer mainly engaged in the production and sales of formwork & scaffolding.

Quick Links

Product Category

Get In Touch

Tel: +86-18201051212
Add:No.8 Shanghai Road, Jianhu Economic Development Zone,Yancheng City, Jiangsu Province, China
Leave a Message
Contact Us
 
Copryright © 2023 Yancheng Lianggong Formwork Co., Ltd. Technology by Leadong.Sitemap